[ethbridge-discuss] when is the patch plan?

Young ju Kim royfran at paran.com
Thu Jul 12 18:48:24 PDT 2007


Hi. Dong Hai Han.
The panic the actual condition with the writings which come up to former times is same.
That it sees that it is more urgent, the data above MTU size and it means that does not become the communication. Also it is a problem where the ping back is not accomplished with the server which is connected with an equipment from the equipment which becomes the bridge.
The iprb from the driver the communication of big size is become accomplished communication of big size does not become accomplished from e1000g driver.
Please, it gives a solution plan and it wishes.

Best regards,

Young Ju Kim
 
 
This message posted from opensolaris.org


More information about the ethbridge-discuss mailing list